skip to Main Content
+65 6862 0311 +65 6862 0313 [email protected]

A typical tubing and casing reclamation process involves a number of operations briefly described below:

  1. Clean OD and ID of recovered pipe.
  2. Electromagnetic inspection of the pipe body of recovered pipe.
  3. Segregate good pipes for pin machining.
  4. Re-machine pin connections on good pipes to TKC 4040 NU.
  5. Buck on new TKC EUE 8RD or TKC 4040 NU couplings.
  6. OD coat and light oil ID and rack for future service.
Back To Top